Hardware Accessories

Rigging Hardware Alloy Steel Forged Lifting Oblong Master Link

Weifang First Rigging Co., Ltd.
  • Shape:Oval
  • Usage:Industrial

Base Info

  • Model NO.:A-342
  • Color:According to Customer Requirements
  • Condition:New
  • Surface Treatment:Plastic Spraying
  • Working Load:21.2t
  • Weight:12.8kg
  • MOQ:100PCS
  • Lead Time:25-30 Days
  • Grade:80 or 100.
  • Sample:Available
  • Feature:Flatened Madter Link
  • Size:1,2-2"
  • Diameter:45mm
  • Transport Package:Packed in Wooden Case, Then in Pallets.
  • Specification:1,2"~4"
  • Trademark:First Rigging
  • Origin:Shandong China
  • HS Code:73269090
  • Production Capacity:150 Tons,Month
  • Package size per unit product:40.00cm * 15.00cm * 10.00cm
  • Gross weight per unit product:6.000kg

Description

NameAlloy Steel Lashing Chain Sling with Master LinkMaterialAlloy steel, carbon steel, stainless steelSurfaceYellow zinc plated, galvanized, hot dip galvanized, black, other color painting also availablePortQingdao in ChinaSampleSample is free of charge, freight covered by customerPackingCarton,Bag,Pallet Or OthersD/T30 days after order confirmation
 ApplicationShip, iron and steel industry, petroleum chemical industry, coal mineDelivery time10~25 days, based on Qty

Rigging Hardware Alloy Steel Forged Lifting Oblong Master LinkRigging Hardware Alloy Steel Forged Lifting Oblong Master Link

Rigging Hardware Alloy Steel Forged Lifting Oblong Master LinkExcellent material
Selection of raw materials product by high quality manufacturers.
Adopt high quanilty alloy steel and refuse to cut corners

Sophisticated tech
Plastic spray treatment corrosion resistance and oxidation resistance,strictly selected.
Welded or forged by professionals ,the surface after plastic spray treatment
Basic info
The main chain sold on the market is mainly 40 chromium, 20 chromium manganese titanium, 35 chromium molybdenum, among which 20 chromium manganese titanium is the most commonRigging Hardware Alloy Steel Forged Lifting Oblong Master LinkRigging Hardware Alloy Steel Forged Lifting Oblong Master LinkRational construction
Unique structure design,for the use of customers,easy to operate ,easy to maintain,improve efficiency.

Quality guarantee
Before the product is put into use,perform pull test.The minimum breaking tension is 4 times rated load.


Our advantages:
Quick reply: all queries will be answered within 12 hours
Experience: Reliable supplier & over 20 years manufacturing rigging hardware, exporting to over 50 countries
3. Timely delivery: from mold to sample within 10 days of delivery
4. Certification :CE, ISO, provide product test report as required, and control each product
With strong research and development capabilities
6. Transportation: Close to Qingdao port and airport, with obvious trade advantages
7 Competitiveness: high quality, lowest ex-factory price, various modes of transportation
8. No minimum order quantity limit, welcome special requirements of customers

Rigging Hardware Alloy Steel Forged Lifting Oblong Master Link

Our services
1. Reply you inquiry with 24 hours.
2.Quality: Good quality control for each product, test reports provided on request. 

3. Price: Offer the lowest ex-factory prices with a wide range of shipping ways. 
4. Certification: ISO, CE Certificated, product quality strictly controlled by QC depart.

5. Provide counter sample with 2-3 weeks according to your samples, drawing or design
6. Samples are free of charge

Rigging Hardware Alloy Steel Forged Lifting Oblong Master Link

FAQ

1.Do you produce them all?
We produce all kinds of chains in our factory, other products in our partner factories. By establishing cooperation agreements & capital injection, we obtained a wide & solid supply chain to meet your demands.
2. What's your regular packing?
Usually packed in cartons and pallets.

3. What's your trems of payment?
1) T/T. 30% in advance, 70% balance before the shipment
2) L/C

4. Can I get a sample for reference?

We offer you a small quantity of free samples, but freight to be covered by yourself.  After receiving the offical order, we will deducts the charge in the first order.
5.How do I receive the goods? 
With our professional transport agents, we are capable of delivery products to most ports all over the world. Door-to-door service is also supported.FOB, C&F, CIF are most commonly used trade terms.
6.How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment and the details are confirmed. The specific delivery time depends on the items and the quantity of your order.