Hardware Accessories

Steel Rubber Draw Toggle Latch Used on Cooler Box

Laizhou Huiding Hardware Co., Ltd.
  • Material:SS304, Ss201, Steel
  • Surface Treatment:Polished, Zinc-Plated
  • Application:Industrial
  • ODM/OEM:Accept
  • Type:Customized
  • Weight:43G

Base Info

  • Model NO.:DK121
  • Transport Package:Carton
  • Trademark:HUIDING
  • Origin:Shandong
  • HS Code:8302490000
  • Production Capacity:100000

Description

Basic Info.

Model NO. DK121 Transport Package Carton Trademark HUIDING Origin Shandong HS Code 8302490000 Production Capacity 100000

Product Description

Steel rubber draw toggle latch used on cooler box


Model number: DK121
Material: Stainless steel 304/ Steel
Surface treatment: Polished/ zinc plated
Management Certification: ISO9001:2015
Origin: Shandong China
OEM orders: accept
Samples: for free
 
ItemMaterialSurfaceLocking loadWeight
DK121SteelNickel-plated  
DK121Stainless steel 201Polished  
DK121Stainless steel 304Polished  




Product application
Widely used in many fields. Like ships, high-speed rail, automobiles, civil products and so on.



Product details
Steel Rubber Draw Toggle Latch Used on Cooler BoxSteel Rubber Draw Toggle Latch Used on Cooler Box

Certificate

Steel Rubber Draw Toggle Latch Used on Cooler Box


Packaging & Delivery
Packing: packing can be made according to your request.
Single package size: 32mm*22mm*15mm

Steel Rubber Draw Toggle Latch Used on Cooler Box

Our factory

Steel Rubber Draw Toggle Latch Used on Cooler Box

Steel Rubber Draw Toggle Latch Used on Cooler Box


FAQ:

Q: Are you a factory or trading company?

A: We are a professional manufacturer. We are warmly welcome clients from worldwide to

visit our factory and cooperate with us.

Q: What's your advantage? Why we choose you?

A: Great production capacity Sustainable Supply.According to customer requirements

we support the customized include package. We have the most professional

technology and team.  

Q: What are your production standards?

A: European standard stamping

Q: How long does the whole procedure being worked out?

A: The lead time is about 30days and it depends if the material is especial.