
Hardware of Alloy Steel Weldless Master Link
Weifang First Rigging Co., Ltd.- Certificate:ISO9001
- Type of Product:a-342 Forged Master Link
Base Info
- Surface Processing:Powder Plastified
- Break Pull:Five Times The Force of The Work
- Transport Package:According to Your Requirements
- Specification:piece
- Trademark:First Rigging
- Origin:China
- HS Code:73261910
- Production Capacity:30ton,Month
- Package size per unit product:40.00cm * 15.00cm * 10.00cm
- Gross weight per unit product:6.000kg
Description
Basic Info.
Surface Processing Powder Plastified Break Pull Five Times The Force of The Work Transport Package According to Your Requirements Specification piece Trademark First Rigging Origin China HS Code 73261910 Production Capacity 30ton/MonthPackaging & Delivery
Package size per unit product 40.00cm * 15.00cm * 10.00cm Gross weight per unit product 6.000kgProduct Description

From the raw material purchase, the company has all adopted the effective management method to the entire flow, Raw materials are from regular high - quality manufacturers, Bao shan Iron & Steel Co, Shang dong Iron and steel Group,etc.

Own factory of us, many years of experience in Round Master Link production, good quality of conscience , supply to some large domestic customers, have a good reputation with low breakage rate, attracted some customers from other places for cooperation. In recent years, our Round Master Link has also attracted more and more foreign customers and continues to go to overseas markets.
Use method show of Master link with other lifting sling :


Related standards of Round Master link :
Application | Ship, iron and steel industry, petroleum chemical industry, coal mine |
Material | Carbon steel |
Size | 1/2"~4" |
Surface treatment | Galvanized, Self color, Plastic spraying |
Color | Red, yellow, blue, as your request |
Strength level | Grade 100,Grade 80 |
Provide ODM, OEM service
Has a professional technical RESEARCH and development team, set research and development, production, sales in one
Technical Specification:

Size | A | B | D | WLL(T) | Weight(Kg) |
1/2 | 127 | 63.5 | 14 | 3.2 | 0.45 |
5/8 | 152 | 76 | 16 | 4.1 | 0.7 |
3/4 | 140 | 70 | 19 | 5.6 | 1 |
7/8 | 160 | 90 | 22 | 6.8 | 1.5 |
1 | 178 | 89 | 25 | 11 | 2.06 |
1-1/4 | 220 | 110 | 32 | 16.4 | 4.23 |
1-1/2 | 267 | 135 | 38 | 24.6 | 7.5 |
1-3/4 | 305 | 152 | 45 | 38.5 | 11.5 |
2 | 355 | 178 | 51 | 46.5 | 16.5 |
2-1/4 | 406 | 203 | 57 | 64.9 | 24.5 |
2-1/2 | 406 | 203 | 63.5 | 72.6 | 31 |
2-3/4 | 406 | 240 | 70 | 97.4 | 41 |
3 | 456 | 228 | 76 | 103.4 | 52 |
3-1/4 | 508 | 254 | 82 | 119 | 66 |
3-1/2 | 610 | 305 | 89 | 126.5 | 91 |
3-3/4 | 508 | 254 | 95 | 152.4 | 90 |
4 | 508 | 254 | 100 | 169.2 | 103.5 |
Only need customer to tell us the three parameters of A,B,D , then we can produce Master link for you .
True mold forging, the choice of confidence quality:
1.High strength and high toughness special alloy steel is selected, through process of heat treated
2.The verification test is gradually performed at 2.5 times of working tension
3.Strict sample breaking test and fatigue test for each batch of product
4.Broken tension is 4 times of working tension
Warning: Never exceed the working load limit to use
Packaging & Delivery:
Packing details: Usually packed in plastic bags, and then in export carton, high quality pallets
Delivery Detail: Usually 30 days after receiving your irrevocable L/C or advance payment.
Features:
1) Nearly 20 years experience in production
2) Owned factory, with superior quality and competitive price
3) ODM,OEM service
4)Research and development team with professional technology.
5)Excellent marketing team with superb business level.
Customer show : To make sure our products meet requirements of different standards, we have all necessary inspection and testing equipment, such as CMM, spectrum, impact testing machine, tensile testing machine, and hardness durometers.
We can pack the products in neutral packing or customized packing(customers need to pay a little extra cost)
Shipping: DHL,TNT,or by sea-shipment
Delivery time: within 30 days after the order confirmed
FAQ :
1. Where is your factory located?
In Changle, near Qingdao city, about 2 hours by car.
Welcome to Visit.
2. What products do you supply?
1)Lifting link chain, Coal Mining chain
2)Round Master link
3)Other related products
3. How do I pay?
TT(Telegraphic Transfer),30% payment in advance, 70% balance before shippment .
4. How do I receive the goods ?
FOB, C&F, CIF are most commonly used trade terms.