Hardware Accessories

Custom Q235B Metal Stamping Parts Powder Coating Parts for Refrigeration Equipment

Ningbo Aier Ventilation Equipment Co., Ltd.
  • Material:Q235
  • Use:Parts for Refrigeration Equipment
  • Surface Treatment:Black Powder Coating
  • Sample:Any Trial Order Is Welcomed
  • Certificate:SGS, ISO 9001,Ce
  • Transport Package:Carton Case + Pallet

Base Info

  • Model NO.:Stamping Parts
  • Specification:custom
  • Trademark:JH
  • Origin:Ningbo, Zhejiang, China
  • HS Code:7326909000
  • Production Capacity:5000 PCS,Day

Description

Q235B Stamping Parts Powder Coating Parts for Refrigeration EquipmentCompany IntroductionWe established in 1997, we are one of the largest manufacturers of metal stamping and plastic moulding injection parts in China, close to the ocean ports of Ningbo and Shanghai.Our specialty is made to order (MTO) parts based  on customer drawings or samples.Our manufacturing capability- Punch machines range from 16T to 500T
- Hydraulic plate shears
- CNC bending machine
- Hydraulic drawbench
- CNC laser cutting
- Robtic welder
- Automatic powder coating line
Our secondary operations in house·    Riveting
·    Tapping
·    Welding
·    Drilling
·    Assembly
·    Painting
·    Powder Coating
Our in house QC equipment·   2D projector tester
·   Torque tester
·   Tension machine
·   Salt spray tester
·   Zinc-coated tester
·   Infrared ray tester
·   Go and no go gauge 
.   Jigs.
Custom Q235B Metal Stamping Parts Powder Coating Parts for Refrigeration Equipment
Custom Q235B Metal Stamping Parts Powder Coating Parts for Refrigeration Equipment
Custom Q235B Metal Stamping Parts Powder Coating Parts for Refrigeration Equipment
Q: What is the payment method?
A: We accept TT (Bank Transfer), L/C.
1. For total amount under US$3000, 100% in advance.
2. For total amount above US$3000, 30% in advance, the rest against the copy document.

Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.
 
Q: What is the production cycle?
A: It varies a lot depending on product dimension,technical requirements and quantity. We always try to
meet customers' requirement by adjusting our workshop schedule. 
Usually our normal lead time is 25-30
days for 1 full container; it is also up to the actual production situation and products structure.

Q: If you make poor quality goods,will you refund our fund?
A: We make products according to drawings or samples strictly until them reach your 100% satisfaction.
And actually we won't take a chance to do poor quality products.We are proud of keeping the spirit of
good quality.


Q: Could you offer competitive tooling cost?
A: We have own mold work-shop in our factory, for competitive tooling cost and on-time
samples.